如需咨询和/或翻译支持,请致电 (916) 324-1541 或发送电子邮件 邮箱:[email protected]. 如需 TTY/TTD 帮助,请致电 (800) 881-5799 或拨打 ...
如需咨询和/或翻译支持,请致电 (916) 324-1541 或发送电子邮件 邮箱:[email protected]. 如需 TTY/TTD 帮助,请致电 (800) 881-5799 或拨打 ...
In a spirit of gratitude, the California High-Speed Rail Authority (Authority) shares heartfelt thanks to all the small ...
The California High-Speed Rail Authority (Authority) is responsible for planning, designing, building, and operating the first high-speed rail system in the nation. California high-speed rail will ...
The California High-Speed Rail Authority (Authority) has prepared the Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the San Jose to Merced Project Section of the ...
As the high-speed rail system grows to include the entire Phase 1 service, opportunities will exist to extend the benefits of Phase 1 service into Phase 2 corridors such as Los Angeles to San Diego ...
California high-speed rail will connect the mega-regions of the state, contribute to economic development and a cleaner environment, create jobs and preserve agricultural and protected lands. The ...
The California High-Speed Rail Authority (Authority) has prepared the Palmdale to Burbank Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the Palmdale to Burbank Project ...
The California High-Speed Rail Authority (Authority) has prepared the Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) for the San Francisco to San Jose Project Section ...
Agenda Item #2 Staff Presentation on the Palmdale to Burbank Project Section Final EIR/EIS and Proposed Selection of the Preferred Alternative (Alternative SR14A including a Central Subsection and the ...
As the high-speed rail system grows to include the entire Phase 1 service, opportunities will exist to extend the benefits of Phase 1 service into Phase 2 corridors such as Merced to Sacramento. This ...
HIGH-SPEED RAIL IS ALREADY HAPPENING in the Central Valley, with construction now spanning 119 miles across Madera, Fresno, Kings, Tulare and Kern counties. The Authority plans to extend this 119-mile ...