A significant milestone was reached in Mumbai with the casting of the first concrete base slab at the BKC bullet train station. This marks the commencement of the 69 slab constructions required for ...
The first concrete base slab of the Mumbai Bullet Train station has been cast, on November 30, 2024, at a depth of about 32 metres from the ground level, which is equivalent to a 10-storey building.